Demolition & Land ClearingTear-outs, rock and brush, hauled offExcavationBasements, footings, mass ex and rockGrading & Site PrepStrip, cut, fill, compact, fine gradeUtilities & DrainageWater, sewer, storm and septicCivil & Site DevelopmentWhole sites, phase by phase, with subsTrucking & HaulingMachine moves, loads and delivery daysRetaining WallsBoulder and block walls, course by courseHardscape & ConcreteFlatwork, curb and gutter, pour daysPaving & Parking LotsThe lot prepped for the paving crewLandscapingBackyards, beds and the homeowner's album
Scheduling software for underground utility contractors.
Water, sewer, storm drain, dry utilities and septic. Book the trench box, the mini ex and the crew to the job, check off locates, and send the owner photos of the pipe before it gets buried.
PVC pipeCatch basinBedding rockPipe to a catch basin, Utah. February 2026.
Legend
WWater
SSSewer
SDStorm drain
EDry utilities
Septic
STA 0+00 to 3+20
Walk the pipe, manhole to catch basin.
Pipe goes in from the low end up, so the line starts at the manhole. Each station is one of the eight phases in Parli's Utilities & Trenching set, with a photo from that stage of a real job and what Parli does there.
Station 1 of 8Locates & Permits
MH-1 STA 0+00
Front-yard utility trench. September 2022.
01 / 08 · STA 0+20
Locates & Permits
Put Locates marked on the task as a checklist item. The crew checks it off from the truck, and the office sees it's done.
Storm drain, MH-1 to CB-1Riverton Medical Office
✓Locates marked
✓Road cut permit on file
Pothole the gas crossing
A checklist item. Parli doesn't pull 811 tickets.
STA 0+20
Trench box on a cleared lot. July 2025.
02 / 08 · STA 0+60
Mobilization
Book the trench box like a machine. Tools are counted, so Parli knows there's still one in the yard.
The yardTue, Oct 20
Trench boxTool · 2 in the yard1 of 2 available
Pipe deliveryTask · Riverton Medical Office7:00 AM
Mini excavatorBooked Mon–ThuRiverton
STA 0+60
Inside a deep trench. June 2022.
03 / 08 · STA 1+00
Trenching
The crew clocks in at the trench. The job, the kind of work and the machine ride on every punch.
On the clock now9:05 AM
MRMiguel R.Trenching · Mini excavator2 h 5 min
DSDakota S.Pipe laying2 h 3 min
No signal in the hole? The punch waits on the phone.
STA 1+00
Tie in hereSetting a storm box. July 2024.
04 / 08 · STA 1+40
Pipe & Conduit
Snap the tie-in, circle it and send it. It's filed to the job with who took it and when.
Filed to Riverton Medical Office10:14 AM
CMCal M. · Markup saved beside the photo
STA 1+40
Stormwater chambers on bedding rock. July 2025.
05 / 08 · STA 1+80
Bedding & Backfill
The foreman files the day from the phone: the crew from the clock, the weather, the work and the photos.
Field reportDuring construction — daily progress
Crew on site
4 From the clock: 4 clocked in
Weather
Sunny
Work performed
Bedded the chambers and backfilled in lifts.
+5
STA 1+80
Manhole cone in a sewer trench.
06 / 08 · STA 2+20
Testing & Inspection
Put the inspector's visit on the job as a task. It's on the foreman's 6 AM round-up that morning.
TaskRiverton Medical Office
City inspection: air test, MH-1 to CB-1
Due Thu, Oct 22 · 9:00 AMCMCal M.
✓Plugs and gauge on the truck
STA 2+20
Street trench before the patch. May 2025.
07 / 08 · STA 2+60
Surface Restoration
Patch, pour and seed go on as tasks. The concrete sub gets an email and taps Yes, we'll be there.
Surface Restoration3 tasks
Patch the asphaltDue Fri, Oct 23
Sidewalk panelRamos Concrete, MonConfirmed
Topsoil and seed the parkwayDue Tue, Oct 27
STA 2+60
Pipe into the catch basin. February 2026.
08 / 08 · STA 3+00
As-Builts & Closeout
Send the owner one link to the photos you pick of the pipe before it was covered. The as-built goes in the job's Files.
Photos for the ownerOne link · no app neededCopy link
PDFAs-built, storm drain.pdfFiles · Riverton Medical Office
Photos you add to it later show up on the same link.
STA 3+00
CB-1 STA 3+20
← Flow to MH-1
The eight phases are the Utilities & Trenching set in Parli. The tasks and names are examples.
Works with no signal
No bars at the bottom of the trench.
Parli opens with what it last loaded. What the crew does down there waits on the phone and goes out when it's back in range.
Clock punchesWait on the phone, then send
Job photosSaved on the phone, sent later
MessagesWait on the phone, then send
Field reportDraft stays on the phone; filing needs signal
Digging a sewer trench along a sidewalk, Utah. July 2023.Unloading a precast box. June 2026.
Off the pipe
Deliveries, subs and tomorrow's crew.
Precast and pipe on the schedule
Put the delivery on the job as a task with its day, and put the loader on the same task. A machine on a task is booked for those dates, so it can't be promised to another job.
Book the paving or concrete sub for the restoration. Parli emails them a link to confirm or reschedule, two days ahead unless you pick another reminder. No app, no login.
Marked-up photos, the field report, the yard and who's coming. Tap one to see it full size.
Point out the problemDraw an arrow, write a note.
Today's photos, already thereThat day's job photos are waiting. Tap to add them.
Know what's in the yardTools by count, like 1 of 2 trench boxes available.
Know who's coming and who confirmedTraffic control, trucking and concrete confirmed. The surveyor not yet.
One link. No app neededThe client opens it in any browser.
No signal? Clock in the crew anywayPunches go to the office by themselves once there's signal.
On the computer
The job, from the office.
Tools by count, subs who confirmed, filed reports and the job's photos.
Tools by countTrench boxes, lasers, pumps and light towers, with how many are free.
Who's coming and who confirmedEvery visit with its job, days, start time and answer.
File oneToday's report for Silver Fork, with five clocked in on the job.
A job's photosGallery, map and the photos still needed, with folders and a search across captions, tags and people.
Questions
Common questions
Can I track locates on a job?
Yes, as a checklist on the task. Add an item like Locates marked, and the crew checks it off from the phone so the office sees it's done. Parli isn't connected to 811, so it won't pull tickets or tell you when one expires.
Can the crew use it in a trench with no signal?
Yes. Parli opens with what it last loaded. Clock punches, job photos and messages wait on the phone and send when it's back in range. A field report needs signal to file, but the draft stays on the phone until then.
Can the inspector or the owner see the photos?
Yes. On paid plans you can share a job's photos as one link, with the ones you pick. They don't need the app, photos you add to it later show up on the same link, and they can save them full size.
How do I schedule the trench box and pipe deliveries?
Add the trench box to the yard as a tool with a count. Parli shows how many are free, like 1 of 2 available, and refuses a booking only when every one is out. Deliveries go on the job as tasks with a date, and you can put the loader on the same task.
Does Parli have an underground utilities template?
Yes, on Corporation+. When you make a job, pick Utilities & Trenching under Industry phase columns, and its board starts with eight phases from Locates & Permits to As-Builts & Closeout. Rename, recolor or delete any of them. An existing job can add them from Board, By bucket, Bucket template sets.
Can I schedule the paving or concrete sub for restoration?
Yes. Book the sub for the day, and Parli emails them a link to confirm or reschedule. They tap Yes, we'll be there. No app, no login. The visit shows on the job's Gantt chart.
Will Parli warn us about rain with a trench open?
Yes. If you're clocked in at a job, Parli tells you about 5 to 15 minutes before rain starts, and severe weather alerts come through for the jobs you're on. It doesn't move the schedule for you.