Scheduling software for underground utility contractors.

Water, sewer, storm drain, dry utilities and septic. Book the trench box, the mini ex and the crew to the job, check off locates, and send the owner photos of the pipe before it gets buried.

The client album link comes with paid plans

Green PVC pipe laid on gravel bedding in a long trench, running to a precast catch basin, a sound wall on the left and a mini excavator on the right at dusk
Pipe to a catch basin, Utah. February 2026.

Legend

  • Water
  • Sewer
  • Storm drain
  • Dry utilities
  • Septic

STA 0+00 to 3+20

Walk the pipe, manhole to catch basin.

Pipe goes in from the low end up, so the line starts at the manhole. Each station is one of the eight phases in Parli's Utilities & Trenching set, with a photo from that stage of a real job and what Parli does there.

Station 1 of 8 Locates & Permits

MH-1 STA 0+00
A utility trench along a new-home front yard, black and copper lines crossing it, a mini excavator bucket beside it
Front-yard utility trench. September 2022.

01 / 08 · STA 0+20

Locates & Permits

Put Locates marked on the task as a checklist item. The crew checks it off from the truck, and the office sees it's done.

Storm drain, MH-1 to CB-1Riverton Medical Office

  • Locates marked
  • Road cut permit on file
  • Pothole the gas crossing

A checklist item. Parli doesn't pull 811 tickets.

A yellow CAT excavator parked beside a steel trench box on a cleared lot under gray clouds
Trench box on a cleared lot. July 2025.

02 / 08 · STA 0+60

Mobilization

Book the trench box like a machine. Tools are counted, so Parli knows there's still one in the yard.

The yardTue, Oct 20

Trench boxTool · 2 in the yard1 of 2 available
Pipe deliveryTask · Riverton Medical Office7:00 AM
Mini excavatorBooked Mon–ThuRiverton
A mini excavator digging inside a deep trench in red dirt, blue sky above
Inside a deep trench. June 2022.

03 / 08 · STA 1+00

Trenching

The crew clocks in at the trench. The job, the kind of work and the machine ride on every punch.

On the clock now9:05 AM

Miguel R.Trenching · Mini excavator2 h 5 min
Dakota S.Pipe laying2 h 3 min

No signal in the hole? The punch waits on the phone.

An excavator lowering a precast storm box on lifting straps into an excavation, with the tie-in hole circled in orange
Setting a storm box. July 2024.

04 / 08 · STA 1+40

Pipe & Conduit

Snap the tie-in, circle it and send it. It's filed to the job with who took it and when.

Filed to Riverton Medical Office10:14 AM

Cal M. · Markup saved beside the photo

Two workers setting orange stormwater chambers on gravel in a fabric-lined pit, excavators and mountains behind
Stormwater chambers on bedding rock. July 2025.

05 / 08 · STA 1+80

Bedding & Backfill

The foreman files the day from the phone: the crew from the clock, the weather, the work and the photos.

Field reportDuring construction — daily progress

Crew on site
4 From the clock: 4 clocked in
Weather
Sunny
Work performed
Bedded the chambers and backfilled in lifts.
A precast manhole cone set in a deep sewer trench, a wheel loader and an excavator beyond
Manhole cone in a sewer trench.

06 / 08 · STA 2+20

Testing & Inspection

Put the inspector's visit on the job as a task. It's on the foreman's 6 AM round-up that morning.

TaskRiverton Medical Office

City inspection: air test, MH-1 to CB-1

Due Thu, Oct 22 · 9:00 AMCal M.
  • Plugs and gauge on the truck
A mini excavator on a residential street beside a sawcut utility trench with white pipe in the bottom, a snowy peak behind
Street trench before the patch. May 2025.

07 / 08 · STA 2+60

Surface Restoration

Patch, pour and seed go on as tasks. The concrete sub gets an email and taps Yes, we'll be there.

Surface Restoration3 tasks

Patch the asphaltDue Fri, Oct 23
Sidewalk panelRamos Concrete, MonConfirmed
Topsoil and seed the parkwayDue Tue, Oct 27
Green PVC pipe on gravel bedding running into a precast catch basin at dusk
Pipe into the catch basin. February 2026.

08 / 08 · STA 3+00

As-Builts & Closeout

Send the owner one link to the photos you pick of the pipe before it was covered. The as-built goes in the job's Files.

Photos for the ownerOne link · no app neededCopy link
As-built, storm drain.pdfFiles · Riverton Medical Office

Photos you add to it later show up on the same link.

CB-1 STA 3+20

The eight phases are the Utilities & Trenching set in Parli. The tasks and names are examples.

Works with no signal

No bars at the bottom of the trench.

Parli opens with what it last loaded. What the crew does down there waits on the phone and goes out when it's back in range.

  • Clock punchesWait on the phone, then send
  • Job photosSaved on the phone, sent later
  • MessagesWait on the phone, then send
  • Field reportDraft stays on the phone; filing needs signal
See Time Clock
Digging a sewer trench along a sidewalk, Utah. July 2023.
A wheel loader lifting a precast concrete box off a flatbed trailer on chains while two crew members in hi-vis vests guide it
Unloading a precast box. June 2026.

Off the pipe

Deliveries, subs and tomorrow's crew.

Precast and pipe on the schedule

Put the delivery on the job as a task with its day, and put the loader on the same task. A machine on a task is booked for those dates, so it can't be promised to another job.

See Equipment Scheduling

The paving sub confirms by email

Book the paving or concrete sub for the restoration. Parli emails them a link to confirm or reschedule, two days ahead unless you pick another reminder. No app, no login.

See Subcontractors

Tomorrow's crew, sent once

Plan who goes to which trench on Dispatch. The crew hears only when you press Send, and each person gets only what changed for them.

See Dispatch

On the phone

From the trench.

Marked-up photos, the field report, the yard and who's coming. Tap one to see it full size.

On the computer

The job, from the office.

Tools by count, subs who confirmed, filed reports and the job's photos.

Questions

Common questions

Can I track locates on a job?

Yes, as a checklist on the task. Add an item like Locates marked, and the crew checks it off from the phone so the office sees it's done. Parli isn't connected to 811, so it won't pull tickets or tell you when one expires.

Can the crew use it in a trench with no signal?

Yes. Parli opens with what it last loaded. Clock punches, job photos and messages wait on the phone and send when it's back in range. A field report needs signal to file, but the draft stays on the phone until then.

Can the inspector or the owner see the photos?

Yes. On paid plans you can share a job's photos as one link, with the ones you pick. They don't need the app, photos you add to it later show up on the same link, and they can save them full size.

How do I schedule the trench box and pipe deliveries?

Add the trench box to the yard as a tool with a count. Parli shows how many are free, like 1 of 2 available, and refuses a booking only when every one is out. Deliveries go on the job as tasks with a date, and you can put the loader on the same task.

Does Parli have an underground utilities template?

Yes, on Corporation+. When you make a job, pick Utilities & Trenching under Industry phase columns, and its board starts with eight phases from Locates & Permits to As-Builts & Closeout. Rename, recolor or delete any of them. An existing job can add them from Board, By bucket, Bucket template sets.

Can I schedule the paving or concrete sub for restoration?

Yes. Book the sub for the day, and Parli emails them a link to confirm or reschedule. They tap Yes, we'll be there. No app, no login. The visit shows on the job's Gantt chart.

Will Parli warn us about rain with a trench open?

Yes. If you're clocked in at a job, Parli tells you about 5 to 15 minutes before rain starts, and severe weather alerts come through for the jobs you're on. It doesn't move the schedule for you.

Schedule your next pipe job on Parli.

Free to start. Paid plans have no limit on machines, tools or trailers.