Civil construction scheduling for the whole site.

Site development is nine phases, a handful of subs and one finish date. Put the crews, the machines and every sub visit on one schedule, and let the subs confirm from an email.

  • 9phases set up for civil work
  • 0apps your subs install
  • 1Gantt chart per job, subs on it
Two crew members setting rows of orange stormwater chambers in a deep pit lined with black fabric, two yellow CAT excavators and mountains behind
PhotoStormwater chambers going inWhereUtahWhenJuly 2025

Sheet C-101 · The site plan

Point at the plan. See who's on it.

An example job, Riverton Medical Office, drawn as a site plan. Pick an area to see its phase, its dates, who's on it and whether the sub has confirmed. The schedule under the sheet lights up to match.

Keynotes

Utilities & Sub-Surface

Storm line and inlets

Lay the storm pipe and set inlets CB-1 through CB-4.

Dates
October 5 – October 20
Crew
Luis A., Rosa D.
Task
In Progress
Sub
None

Going on now. The detention chambers are linked to it, so if the storm line finishes late, the chambers move with it.

ProjectRiverton Medical Office
SheetC-101 Site plan
PhasesCivil / Sitework
DateOctober 16
StatusExample job
NoteIllustration of an example job. Parli doesn't draw plans; it keeps the schedule that goes with one.

Schedule · Riverton Medical Office

Read the plan and schedule as a table
Riverton Medical Office, an example civil job: each area on the plan with its phase, dates, crew, sub and status
KeynoteWorkPhaseDatesCrewSub and statusTask
1Survey control and stakingPre-ConstructionAugust 31 – September 1NoneBenchmark Land Surveying, staking: DoneNo crew task
–Fence the site, move the machines inMobilizationSeptember 2 – September 4Cody M.NoneCompleted
2Old asphalt and drive approachDemoSeptember 8 – September 11Cody M., Tanner O.Ridgeline Trucking, haul it off: DoneCompleted
3Building areaExcavationSeptember 14 – September 25Miguel R., Dakota S.NoneCompleted
4Water and sewer tie-insUtilities & Sub-SurfaceSeptember 28 – October 2Tanner O., Luis A.Wasatch Traffic Control, lane closure: DoneCompleted
5Storm line and inletsUtilities & Sub-SurfaceOctober 5 – October 20Luis A., Rosa D.NoneIn Progress
6Underground detentionUtilities & Sub-SurfaceOctober 21 – October 23Luis A., Miguel R.Ridgeline Trucking, drain rock: ConfirmedNot Started
7Curb and gutterConcrete & AsphaltOctober 27 – October 30NoneRamos Concrete, curb and gutter: ConfirmedNo crew task
8Sidewalks and ADA rampsConcrete & AsphaltNovember 2 – November 4NoneRamos Concrete, sidewalks and ramps: Not confirmed yetNo crew task
9Parking lotConcrete & AsphaltNovember 5 – November 12Dakota S., Cody M.Ridgeline Trucking, road base (November 5 – November 6): Not confirmed yetNot Started
–Compaction tests and the city walkInspections & TestingNovember 16 – November 17Rosa D.NoneNot Started
–Punch list itemsPunch ListNovember 18 – November 20Tanner O., Rosa D.NoneNot Started
–Final walk with the ownerCloseoutNovember 23 – November 25Miguel R.NoneNot Started

Sheet C-001 · Index

Nine phases, already on the board.

Make the job, choose Start from template, and pick Civil / Sitework Contractor under Industry phase columns. The job's board starts with these nine phases. Rename them, recolor them, or delete the ones you don't do.

Already have the job going? Add the set from Board, By bucket, Bucket template sets.

  1. 01Pre-ConstructionSurvey control and staking
  2. 02MobilizationFence the site, move the machines in
  3. 03DemoOld asphalt and drive approach
  4. 04ExcavationBuilding area
  5. 05Utilities & Sub-SurfaceWater and sewer tie-ins · Storm line and inlets · Underground detention
  6. 06Concrete & AsphaltCurb and gutter · Sidewalks and ADA ramps · Parking lot
  7. 07Inspections & TestingCompaction tests and the city walk
  8. 08Punch ListPunch list items
  9. 09CloseoutFinal walk with the owner

Sheet C-201 · Subs

Many subs. One schedule.

Schedule confirmation

Still good for Monday, November 2?

Job
Riverton Medical Office
Dates
Monday, November 2 – Wednesday, November 4
Work
Pour the sidewalks and the ADA ramps
Confirm or reschedule

The page it opens

Still good for November 2 – November 4?

Yes, we'll be there Propose a different time
What Ramos Concrete gets. An email and one page, with no app and no login.
  1. Book the visitPick the sub, the days, the start time and the work. The visit shows on the job's Gantt chart, under the tasks.
  2. Parli asks for youBy email, 1, 2, 3, 7 or 14 days before (2 unless you change it), plus a second ask if you want one.
  3. They answerYes, we'll be there. Or they propose a different time, and you get an email to accept or decline it.
  4. Their own linkEvery sub has a private schedule link with their upcoming visits, on this job and the next.

Someone out?

Luis is out sick Monday. Mark him out and Parli lists what he was on, the storm line and the chambers, then suggests who can step in, starting with people who are free and already on that job.

See Subcontractors

On the phone

From the site, on the phone.

Who confirmed, the whole job by week, the daily report and the photo link. Tap one to see it full size.

Sheet C-301 · The daily record

What happened on site, every day.

Field reportExample

Job
Riverton Medical Office
Type
During construction — daily progress
Date
October 15
Crew on site
6 From the clock: 6 clocked in
Weather
Sunny
Photos
4 attached
Work performed
Set CB-3. Laid 120 feet of 15-inch storm pipe toward CB-4 and backfilled it in lifts.
Issues or delays
Found an old irrigation line at CB-3. Capped it and lost about an hour.
The foreman files it from the phone. Filing needs signal, so at the back of the site the draft stays on the phone until it's sent. Clock punches, photos and messages wait and send later too.

One link for the owner or the GC

Send them the job's photos as one link. They don't need the app, new photos land on the same link, and they can save any photo full size.

See Photos

The crew hears about it

  • New work, the moment you put them on a task
  • Messages, and video calls that ring with the app closed
  • A 6 AM round-up of what's due
  • Nothing between 9 PM and 5 AM

Sheet C-501 · Details

Real site work, Utah.

Every photo on this page is from a real civil or utility job in Utah, not a stock photo.

A precast concrete storm drain box with pipe connections in an open excavation at an intersection, a compactor and a mini excavator beside it
Storm box at an intersectionJuly 2024
A wheel loader lifting a precast concrete box off a trailer on chains while two crew members in hi-vis vests guide it
Precast box off the trailerJune 2026
New concrete curb, gutter and sidewalk with an ADA ramp at the corner, caution tape across it and a graded lot behind
Curb, gutter and an ADA ramp
A mini excavator at a street corner beside two open trenches, aluminum trench shoring and caution tape
Utility tie-in at a street cornerMay 2025

On the computer

The whole job, from the office.

Who's coming, the job by week, crew on the chart, job costs and the filed reports.

Questions

Common questions

How do subs confirm their dates?

Parli emails them a link with the job, the dates, the start time and the work. They tap Yes, we'll be there, or Propose a different time. They don't need the app or a login. You pick when the ask goes out: 1, 2, 3, 7 or 14 days before, plus a second ask if you want one.

Does Parli have a template for civil and sitework jobs?

Yes. When you make a job, choose Start from template and pick Civil / Sitework Contractor under Industry phase columns. The job board starts with nine phases, from Pre-Construction to Closeout. Rename, recolor or delete any of them.

Can the owner or the GC see progress?

Send them the job's photos as one link. They don't need the app, new photos keep landing on the same link, and they can save any photo full size.

Can I see what a job is costing?

Yes, on the job's page. Costs you add and the crew's hours from the time clock count against the budget, split into materials, labor, equipment and subcontractors, with what's left. People who manage the work see the costs. Crew members see the work, not the money.

Does it handle long jobs with a lot of phases?

Yes. Each job has its own Gantt chart that zooms from days out to weeks and months. Link tasks so a late storm line pushes back the work that waits on it, set milestones for the big dates, and see sub visits on the same chart. The Gantt chart comes with every paid plan.

Does Parli read plans or build bids?

No. Parli doesn't open CAD files, mark up plan sheets or do bids. It keeps the schedule, the crew, the subs and the daily record for the job. The plan drawing on this page is an illustration.