Civil construction scheduling for the whole site.
Site development is nine phases, a handful of subs and one finish date. Put the crews, the machines and every sub visit on one schedule, and let the subs confirm from an email.
- 9phases set up for civil work
- 0apps your subs install
- 1Gantt chart per job, subs on it
Sheet C-101 · The site plan
Point at the plan. See who's on it.
An example job, Riverton Medical Office, drawn as a site plan. Pick an area to see its phase, its dates, who's on it and whether the sub has confirmed. The schedule under the sheet lights up to match.
Keynotes
Utilities & Sub-Surface
Storm line and inlets
Lay the storm pipe and set inlets CB-1 through CB-4.
- Dates
- October 5 – October 20
- Crew
- Luis A., Rosa D.
- Task
- In Progress
- Sub
- None
- Sub status
Going on now. The detention chambers are linked to it, so if the storm line finishes late, the chambers move with it.
Schedule · Riverton Medical Office
Read the plan and schedule as a table
| Keynote | Work | Phase | Dates | Crew | Sub and status | Task |
|---|---|---|---|---|---|---|
| 1 | Survey control and staking | Pre-Construction | August 31 – September 1 | None | Benchmark Land Surveying, staking: Done | No crew task |
| – | Fence the site, move the machines in | Mobilization | September 2 – September 4 | Cody M. | None | Completed |
| 2 | Old asphalt and drive approach | Demo | September 8 – September 11 | Cody M., Tanner O. | Ridgeline Trucking, haul it off: Done | Completed |
| 3 | Building area | Excavation | September 14 – September 25 | Miguel R., Dakota S. | None | Completed |
| 4 | Water and sewer tie-ins | Utilities & Sub-Surface | September 28 – October 2 | Tanner O., Luis A. | Wasatch Traffic Control, lane closure: Done | Completed |
| 5 | Storm line and inlets | Utilities & Sub-Surface | October 5 – October 20 | Luis A., Rosa D. | None | In Progress |
| 6 | Underground detention | Utilities & Sub-Surface | October 21 – October 23 | Luis A., Miguel R. | Ridgeline Trucking, drain rock: Confirmed | Not Started |
| 7 | Curb and gutter | Concrete & Asphalt | October 27 – October 30 | None | Ramos Concrete, curb and gutter: Confirmed | No crew task |
| 8 | Sidewalks and ADA ramps | Concrete & Asphalt | November 2 – November 4 | None | Ramos Concrete, sidewalks and ramps: Not confirmed yet | No crew task |
| 9 | Parking lot | Concrete & Asphalt | November 5 – November 12 | Dakota S., Cody M. | Ridgeline Trucking, road base (November 5 – November 6): Not confirmed yet | Not Started |
| – | Compaction tests and the city walk | Inspections & Testing | November 16 – November 17 | Rosa D. | None | Not Started |
| – | Punch list items | Punch List | November 18 – November 20 | Tanner O., Rosa D. | None | Not Started |
| – | Final walk with the owner | Closeout | November 23 – November 25 | Miguel R. | None | Not Started |
Sheet C-001 · Index
Nine phases, already on the board.
Make the job, choose Start from template, and pick Civil / Sitework Contractor under Industry phase columns. The job's board starts with these nine phases. Rename them, recolor them, or delete the ones you don't do.
Already have the job going? Add the set from Board, By bucket, Bucket template sets.
- 01Pre-ConstructionSurvey control and staking
- 02MobilizationFence the site, move the machines in
- 03DemoOld asphalt and drive approach
- 04ExcavationBuilding area
- 05Utilities & Sub-SurfaceWater and sewer tie-ins · Storm line and inlets · Underground detention
- 06Concrete & AsphaltCurb and gutter · Sidewalks and ADA ramps · Parking lot
- 07Inspections & TestingCompaction tests and the city walk
- 08Punch ListPunch list items
- 09CloseoutFinal walk with the owner
Sheet C-201 · Subs
Many subs. One schedule.
Schedule confirmation
Still good for Monday, November 2?
- Job
- Riverton Medical Office
- Dates
- Monday, November 2 – Wednesday, November 4
- Work
- Pour the sidewalks and the ADA ramps
The page it opens
Still good for November 2 – November 4?
Yes, we'll be there Propose a different time- Book the visitPick the sub, the days, the start time and the work. The visit shows on the job's Gantt chart, under the tasks.
- Parli asks for youBy email, 1, 2, 3, 7 or 14 days before (2 unless you change it), plus a second ask if you want one.
- They answerYes, we'll be there. Or they propose a different time, and you get an email to accept or decline it.
- Their own linkEvery sub has a private schedule link with their upcoming visits, on this job and the next.
Someone out?
Luis is out sick Monday. Mark him out and Parli lists what he was on, the storm line and the chambers, then suggests who can step in, starting with people who are free and already on that job.
See SubcontractorsOn the phone
From the site, on the phone.
Who confirmed, the whole job by week, the daily report and the photo link. Tap one to see it full size.
-
Know who's coming and who confirmedTraffic control, trucking and concrete confirmed. The surveyor not yet.
-
The whole job, start to finishA job's whole schedule by month, with today marked.
-
Move one task. The rest follow.Arrows show which tasks wait on which.
-
File the day from the jobPick the job and the weather, with the crew count from the clock.
-
Someone called in sick? Find coverWhat he was on, and who can step in.
-
One link. No app neededPhotos added later show up on the same link.
Sheet C-301 · The daily record
What happened on site, every day.
Field reportExample
- Job
- Riverton Medical Office
- Type
- During construction — daily progress
- Date
- October 15
- Crew on site
- 6 From the clock: 6 clocked in
- Weather
- Sunny
- Photos
- 4 attached
- Work performed
- Set CB-3. Laid 120 feet of 15-inch storm pipe toward CB-4 and backfilled it in lifts.
- Issues or delays
- Found an old irrigation line at CB-3. Capped it and lost about an hour.
One link for the owner or the GC
Send them the job's photos as one link. They don't need the app, new photos land on the same link, and they can save any photo full size.
See PhotosThe crew hears about it
- New work, the moment you put them on a task
- Messages, and video calls that ring with the app closed
- A 6 AM round-up of what's due
- Nothing between 9 PM and 5 AM
Sheet C-501 · Details
Real site work, Utah.
Every photo on this page is from a real civil or utility job in Utah, not a stock photo.




On the computer
The whole job, from the office.
Who's coming, the job by week, crew on the chart, job costs and the filed reports.
-
Who's coming and who confirmedEvery visit with its job, days, start time and answer.
-
The whole job by weekZoomed out to weeks, with the milestones along the top.
-
Crew and machines on the chartThe people and machines booked to the job, below the tasks.
-
Job costsBudget, spent and what's left, and where it went.
-
Filed reportsSearch them, filter by job, and spot the weather delay and the safety report.
Questions
Common questions
How do subs confirm their dates?
Parli emails them a link with the job, the dates, the start time and the work. They tap Yes, we'll be there, or Propose a different time. They don't need the app or a login. You pick when the ask goes out: 1, 2, 3, 7 or 14 days before, plus a second ask if you want one.
Does Parli have a template for civil and sitework jobs?
Yes. When you make a job, choose Start from template and pick Civil / Sitework Contractor under Industry phase columns. The job board starts with nine phases, from Pre-Construction to Closeout. Rename, recolor or delete any of them.
Can the owner or the GC see progress?
Send them the job's photos as one link. They don't need the app, new photos keep landing on the same link, and they can save any photo full size.
Can I see what a job is costing?
Yes, on the job's page. Costs you add and the crew's hours from the time clock count against the budget, split into materials, labor, equipment and subcontractors, with what's left. People who manage the work see the costs. Crew members see the work, not the money.
Does it handle long jobs with a lot of phases?
Yes. Each job has its own Gantt chart that zooms from days out to weeks and months. Link tasks so a late storm line pushes back the work that waits on it, set milestones for the big dates, and see sub visits on the same chart. The Gantt chart comes with every paid plan.
Does Parli read plans or build bids?
No. Parli doesn't open CAD files, mark up plan sheets or do bids. It keeps the schedule, the crew, the subs and the daily record for the job. The plan drawing on this page is an illustration.
Put the whole site
on one schedule.
Free to start. Your subs never need the app.


Here it is