- Sewer air test, MH-1 to MH-6
- Strip and stockpile topsoil
- Strip and stockpile topsoil
- Rough grade lots 31 through 62
- Strip and stockpile topsoil
- Rough grade lots 31 through 62
- Strip and stockpile topsoil
- Rough grade lots 31 through 62
- Rough grade lots 31 through 62
- Rough grade lots 31 through 62
- Storm drain, inlets 1 through 8
- Over-excavate grids D through F
- Rough grade lots 31 through 62
- Dustin Hale → Oquirrh Ridge Phase 3
- Cody Reyes → Copper Creek Retail
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Storm drain, inlets 1 through 8
- Over-excavate grids D through F
- Rough grade lots 31 through 62
- Dig the basement to 9 feet
- Dustin Hale → Oquirrh Ridge Phase 3
- Cody Reyes → Copper Creek Retail
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- 2018 CAT D5 → Copper Creek Retail
- Storm drain, inlets 1 through 8
- Over-excavate grids D through F
- Rough grade lots 31 through 62
- Dig the basement to 9 feet
- Lay 12-inch C900, station 12+00 to 24+00
- Dustin Hale → Oquirrh Ridge Phase 3
- Cody Reyes → Copper Creek Retail
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- 2018 CAT D5 → Copper Creek Retail
- Marcus Webb → 7800 South Waterline
- Wasatch Traffic Control → 7800 South Waterline
- Storm drain, inlets 1 through 8
- Over-excavate grids D through F
- Rough grade lots 31 through 62
- Lay 12-inch C900, station 12+00 to 24+00
- Fix the silt fence on lot 44
- Density tests every lift
- Dustin Hale → Oquirrh Ridge Phase 3
- Cody Reyes → Copper Creek Retail
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- 2018 CAT D5 → Copper Creek Retail
- Marcus Webb → 7800 South Waterline
- Water pump seal · 2018 International HV607
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Storm drain, inlets 1 through 8
- Rough grade lots 31 through 62
- Lay 12-inch C900, station 12+00 to 24+00
- Final grading plan from the engineer
- Dustin Hale → Oquirrh Ridge Phase 3
- Cody Reyes → Copper Creek Retail
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- 2018 CAT D5 → Copper Creek Retail
- Marcus Webb → 7800 South Waterline
- Scheduled service · 2021 CAT 336
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Rough grade lots 31 through 62
- Lay 12-inch C900, station 12+00 to 24+00
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Rough grade lots 31 through 62
- Lay 12-inch C900, station 12+00 to 24+00
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Rough grade lots 31 through 62
- Lay 12-inch C900, station 12+00 to 24+00
- Retaining wall footing on the north side
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Lay 12-inch C900, station 12+00 to 24+00
- Retaining wall footing on the north side
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Retaining wall footing on the north side
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Fine grade roads A and B
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Uinta Concrete → Riverton Medical Office
- Fine grade roads A and B
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
- Uinta Concrete → Riverton Medical Office
- Fine grade roads A and B
- Wasatch Traffic Control → 7800 South Waterline
- Fine grade roads A and B
- Wasatch Traffic Control → 7800 South Waterline
- Fine grade roads A and B
- Wasatch Traffic Control → 7800 South Waterline
- Fine grade roads A and B
- Wasatch Traffic Control → 7800 South Waterline
Thursday15
- Storm drain, inlets 1 through 8Oquirrh Ridge Phase 3
- Over-excavate grids D through FCopper Creek Retail · 7:00 AM
- Rough grade lots 31 through 62Oquirrh Ridge Phase 3
- Lay 12-inch C900, station 12+00 to 24+007800 South Waterline
- Fix the silt fence on lot 44Oquirrh Ridge Phase 3
- Density tests every liftCopper Creek Retail · 1:00 PM
- Dustin Hale → Oquirrh Ridge Phase 3Crew & equipment
- Cody Reyes → Copper Creek RetailCrew & equipment
- 2021 CAT 336 → Oquirrh Ridge Phase 3Crew & equipment
- 2018 CAT D5 → Copper Creek RetailCrew & equipment
- Marcus Webb → 7800 South WaterlineCrew & equipment
- Water pump seal · 2018 International HV607Maintenance
- Canyon Trucking → Copper Creek RetailSub visit
- Wasatch Traffic Control → 7800 South WaterlineSub visit
Friday16
- Storm drain, inlets 1 through 8Oquirrh Ridge Phase 3
- Rough grade lots 31 through 62Oquirrh Ridge Phase 3
- Lay 12-inch C900, station 12+00 to 24+007800 South Waterline
- Final grading plan from the engineerBluffdale Detention Pond
- Dustin Hale → Oquirrh Ridge Phase 3Crew & equipment
- Cody Reyes → Copper Creek RetailCrew & equipment
- 2021 CAT 336 → Oquirrh Ridge Phase 3Crew & equipment
- 2018 CAT D5 → Copper Creek RetailCrew & equipment
- Marcus Webb → 7800 South WaterlineCrew & equipment
- Scheduled service · 2021 CAT 336Maintenance
- Canyon Trucking → Copper Creek RetailSub visit
- Wasatch Traffic Control → 7800 South WaterlineSub visit
Saturday17
- Rough grade lots 31 through 62Oquirrh Ridge Phase 3
- Lay 12-inch C900, station 12+00 to 24+007800 South Waterline
- 2021 CAT 336 → Oquirrh Ridge Phase 3Crew & equipment
- Canyon Trucking → Copper Creek RetailSub visit
- Wasatch Traffic Control → 7800 South WaterlineSub visit
Everything is hidden. Turn a layer back on.
Thursday15
- TaskStorm drain, inlets 1 through 8Oquirrh Ridge Phase 3
- TaskOver-excavate grids D through FCopper Creek Retail · 7:00 AM
- TaskRough grade lots 31 through 62Oquirrh Ridge Phase 3
- TaskLay 12-inch C900, station 12+00 to 24+007800 South Waterline
- TaskFix the silt fence on lot 44Oquirrh Ridge Phase 3
- TaskDensity tests every liftCopper Creek Retail · 1:00 PM
- Crew & equipmentDustin Hale → Oquirrh Ridge Phase 3Booked today
- Crew & equipmentCody Reyes → Copper Creek RetailBooked today
- Crew & equipment2021 CAT 336 → Oquirrh Ridge Phase 3Booked today
- Crew & equipment2018 CAT D5 → Copper Creek RetailBooked today
- Crew & equipmentMarcus Webb → 7800 South WaterlineBooked today
- MaintenanceWater pump seal · 2018 International HV607Repair
- Sub visitCanyon Trucking → Copper Creek RetailBooked today
- Sub visitWasatch Traffic Control → 7800 South WaterlineBooked today
The whole month. Every job.
Tasks, crews, machines, service and sub visits on one calendar. Zoom in to three days or one, and turn off what you don't need.
View
Show
For the crew
Just your day. Nothing else.
A crew login sees their own tasks, their own bookings and the subs coming to their jobs. The office sees everything, and switches between My tasks and All tasks.
The officeThursday, October 15 · 14 things
- Storm drain, inlets 1 through 8
- Over-excavate grids D through F
- Rough grade lots 31 through 62
- Lay 12-inch C900, station 12+00 to 24+00
- Fix the silt fence on lot 44
- Density tests every lift
- Dustin Hale → Oquirrh Ridge Phase 3
- Cody Reyes → Copper Creek Retail
- 2021 CAT 336 → Oquirrh Ridge Phase 3
- 2018 CAT D5 → Copper Creek Retail
- Marcus Webb → 7800 South Waterline
- Water pump seal · 2018 International HV607
- Canyon Trucking → Copper Creek Retail
- Wasatch Traffic Control → 7800 South Waterline
Cody's phoneThursday, October 15 · 4 things
- Over-excavate grids D through FCopper Creek Retail · 7:00 AM
- Density tests every liftCopper Creek Retail · 1:00 PM
- Cody Reyes → Copper Creek RetailCrew & equipment
- Canyon Trucking → Copper Creek RetailSub visit
On the phone
The calendar
in your pocket.
Swipe, scroll or drag. Tap one to see it full size.
-
The whole month, every jobEvery job in one month view.
-
The next three days, at a glanceThree days of work, with urgent tasks in orange.
-
Just your day. Nothing else.His task, his crew booking and the trucking sub, with Mine turned on.
-
Who's where. What's where.Tasks turned off: every person and machine booked today.
People and machines
Who's where. What's where.
Turn tasks off and the calendar becomes a list of every person and machine booked each day, job by job. Need something new on a day? Tap the day and add the task right there.
Everything included
What's on the calendar
Day, 3 days or month
Three views of the same schedule. Month scrolls three months back and six ahead.
Every job at once
Tasks from every job on one calendar, with multi-day work across its days.
Crew and machines
Who and what is booked where, day by day.
Service on its day
Equipment maintenance shows on the day it is scheduled.
Sub visits
Subcontractors show on the days they are coming.
Show only what you need
Tap Tasks, Crew & equipment, Maintenance or Subs to hide or show them.
My tasks or all tasks
Managers switch between their own tasks and the whole company's.
Just your day for the crew
Crew members see their own tasks, their bookings and the subs coming to their jobs.
Urgent work stands out
High and critical tasks show in orange.
Add a task from a day
Tap a day and add a task for that date.
Start times
Tasks with a start time show it on the calendar.
On the phone
The same calendar on iPhone and Android, with a colored bar for each day of the month.
Questions
Common questions
What shows on the Parli calendar?
Tasks, crew and equipment bookings, equipment maintenance and subcontractor visits. Tap the key to hide any of them.
Can my crew see everyone's schedule?
No. Crew members see their own tasks, their own bookings and the subs coming to their jobs. Managers can switch between My tasks and All tasks.
Can I drag things around on the calendar?
Not on the calendar. Move a task on the job's Gantt chart, and people and machines on the dispatch board.
Does it sync with Google or Outlook?
No. The calendar lives in Parli, on the phone, the tablet and the computer.
Can I add a task from the calendar?
Yes. Tap any day and add a task for that date, or use New task at the top.
Is there a week view?
Use 3 days for the next few days up close, or Month for the big picture.
On the computer
The office
calendar.
The month, three days of tasks and three days of bookings. Tap one to open it.
-
The monthEvery job, every day, with the busy days easy to spot.
-
Three days of tasksCrew and machines hidden, so the work stands out. Urgent tasks in orange.
-
Three days of bookingsTasks hidden: who and what is booked on each job.
Every job on
one calendar.
Free to start, on iPhone, Android and the computer.
Jobsite and machine photos on this page are from real jobs in Utah. Screens are from the Parli app.


Here it is