Demolition & Land ClearingTear-outs, rock and brush, hauled offExcavationBasements, footings, mass ex and rockGrading & Site PrepStrip, cut, fill, compact, fine gradeUtilities & DrainageWater, sewer, storm and septicCivil & Site DevelopmentWhole sites, phase by phase, with subsTrucking & HaulingMachine moves, loads and delivery daysRetaining WallsBoulder and block walls, course by courseHardscape & ConcreteFlatwork, curb and gutter, pour daysPaving & Parking LotsThe lot prepped for the paving crewLandscapingBackyards, beds and the homeowner's album
Scheduling software for demolition and land clearing contractors.
An old house, a slab, trees, brush and rock. Book the breaker, the trailers and the crew to each phase, confirm your subs by email, and Parli won't promise one machine to two jobs.
An old house lot, cleared for Copper Creek Retail. Step through the eight phases Parli sets up for a demolition job and see what it keeps track of at each one.
Before · 0 of 8
The lot as you find it: an old house with an attached garage, a shed, an old slab, a driveway, six trees, brush along the back fence and rock in the northeast corner. The power drop goes from the pole to the house.
Before · Copper Creek Retail
An old lot, eight phases from clean.
Make the job and pick Demolition under Industry phase columns. Its board starts with the eight phases above, in order. Rename, recolor or delete any of them.
New job›Start from template›Industry phase columns›Demolition
0102030405060708
A job you already have gets them from Board, By bucket, Bucket template sets.
Press Next step to start clearing.
Phase 1 · Permits & Utility Disconnects
The disconnects, checked off on the task.
Put each disconnect on the task as a checklist item. As they're checked off, the task's progress bar moves with them. Try it.
Utility disconnectsCopper Creek Retail · Due Mon, Oct 19
Checklist3 of 5
Parli keeps the list. It doesn't file permits or call the utilities.
Phase 2 · Abatement & Prep
The abatement sub, confirmed by email.
Put the sub's visit on the job and Parli emails them to confirm or reschedule, 2 days before by default. They don't need the app or a login.
What the sub opens
Still good for Tue, Oct 20, 7:00 AM?
Copper Creek Retail · Abatement before the tear-down
Yes, we'll be therePropose a different time
Abatement subTue, Oct 20 · 7:00 AMConfirmed
A new time they propose comes to the office by email to accept or decline.
Phase 3 · Mobilization
The breaker, booked to one job at a time.
Book the excavator, the breaker and the loader to the job for the days you need them. Each one can be on only one job on those days.
2019 CAT 320EX-102 · ExcavatorOct 21–23
Hydraulic breakerAT-12 · AttachmentOct 21–23
2023 CAT 259D3SK-501 · Track loaderOct 21–28
Try to put the breaker on Henderson Basement on Thursday:
Hydraulic breaker is somewhere else.One place at a time. Here is what has it: Copper Creek Retail, Oct 21–23. Or pick dates after Friday.
Phase 4 · Structure Demo
The machines ride on the task.
Put the excavator and the breaker on the tear-down task. They're booked for its dates, and when the task moves on the Gantt chart, they move with it. If one is busy on the new days, Parli won't make the move.
Tear down the house, garage and shedCopper Creek Retail · Wed, Oct 21 – Fri, Oct 23
CrewMiguel R.Dakota S.
Machines2019 CAT 320Hydraulic breaker
Miguel R. clocked in at 6:58 AM · Copper Creek Retail · 2019 CAT 320
Phase 5 · Sort & Haul-Off
Trailers on the job. The trucking sub confirmed.
Transfer and dump trailers book like machines, one job at a time. Ridgeline Trucking gets an email to confirm the haul-off days.
Each attachment books on its own, so the stump grinder can't land on two jobs on the same day. Note which machines each one fits.
Brush CutterMon, Oct 26Fits: CAT 259D3
MulcherMon, Oct 26
GrappleMon–Tue
Stump GrinderTue, Oct 27
BreakerTue, Oct 27For the rock
Grading BucketWed, Oct 28
Phase 7 · Final Inspection
The inspection is a task with a day on it.
Put the final inspection on the job as a task. Whoever's on it sees it on their calendar and in the 6 AM round-up of what's due that morning.
Parli · 6:00 AMWhat's due: Final inspection, Copper Creek Retail
Final inspectionCopper Creek Retail · Rosa D. · Thu, Oct 29Completed
Phase 8 · Closeout
A clean lot, on the record.
The foreman files the closeout report from the phone. Then send the owner the job's photos as one link. No app, and new photos land on the same link.
Type
End of construction — closeout & punch list
Crew on site
3 From the clock: 3 clocked in
Weather
Sunny
Work performed
House, garage, shed, slab and drive out. Trees, stumps, brush and rock out. Rough graded, ready for the builder.
Photos
An illustration of an example job. The eight phases are the Demolition set in Parli; the dates and names are examples.
Photos
Shoot the curb before the first swing.
Before anything comes down, get the curb, the sidewalk and the neighbor's fence on record. Every photo files itself to the job with who took it and when, and where if location is on.
Photos this job still needsCopper Creek Retail
Curb and gutter, whole frontageTaken · Dakota S. · 7:08 AM
Sidewalk at the drivewayTaken · Dakota S. · 7:10 AM
Neighbor's fence, north lineNeededTake it
Power pole at the cornerNeededTake it
The crew sees the list on their camera.
Draw an arrow and a note on a photo. The clean copy stays beside the marked one.
When the lot is clear, shoot the same spots again and slide between before and after.
Breaking rock in a basement pit at dusk. September 2023.Stripping an overgrown lot. May 2025.Roots and stumps out of a front yard. October 2022.
Cleared red dirt at golden hour, Utah. April 2022.
Works with no signal
Raw land. No bars. Still on the clock.
Parli opens with what it last loaded. Clock-ins, job photos and messages wait on the phone and send themselves when it's back in range.
Waiting to sendOquirrh Ridge Phase 3
Crew clocked inCody M. and 2 more · 6:56 AMWaiting
6 photosGrubbing, east sideWaiting
Message to the office"Stumps are out. Grading tomorrow."Waiting
No signal. Everything waits on the phone.
A field report draft stays on the phone until there's signal to file it.
On the phone
From the lot, on the phone.
Subs, the yard, photos and the day's report. Tap one to see it full size.
Know who's coming and who confirmedTraffic control, trucking and concrete confirmed. The surveyor not yet.
Know what's in the yardTools by count, like 1 of 2 trench boxes available.
Every machine. Where it is.Fifteen machines, the job each is on, and two flagged for service.
Ask for the shotThe crew sees the list on their camera.
Today's photos, already thereThat day's job photos are waiting. Tap to add them.
One link. No app neededPhotos added later show up on the same link.
On the computer
The job, from the office.
Who's coming, the yard, the Gantt chart and the field report.
Who's coming and who confirmedEvery visit with its job, days, start time and answer.
Every machine, where it isFifteen machines with the job each is on, and two flagged Service overdue.
Crew and machines on the chartThe people and machines booked to the job, below the tasks.
File oneToday's report for Oquirrh Ridge, with five clocked in on the job.
Questions
Common questions
Does Parli have a demolition template?
Yes. When you make a job, pick Demolition under Industry phase columns and its board starts with eight phases, from Permits & Utility Disconnects to Closeout. An existing job gets them from Board, By bucket, Bucket template sets. Rename, recolor or delete any of them.
Can I track utility disconnects?
Yes, as a checklist on a task: power, gas, water, sewer, the permit posted on site, whatever your list is. Checking items off moves the task's progress bar. Parli keeps the list; it doesn't file permits or call the utilities for you.
Can I book the breaker and the dump trailers?
Yes. Machines, attachments like the breaker, and trailers like dump and transfer trailers are booked to a job for the days you need them. One can't be on two jobs on the same days, and Parli shows you what has it.
Can I schedule the abatement sub?
Yes. Put the sub's visit on the job and Parli emails them a link to confirm or reschedule. The ask goes out 2 days before by default, or 1, 3, 7 or 14. They don't need the app or a login, and the visit shows on the job's Gantt chart.
Does Parli track loads or dump tickets?
No. You can book the trailers and the trucking sub, and file a field report with photos of the day, but Parli doesn't count loads, keep dump tickets or track where debris goes.
Does it work on a raw land site with no signal?
Yes. Parli opens with what it last loaded. Clock-ins, job photos and messages wait on the phone and send themselves when it's back in range. A field report draft stays on the phone until there's signal to file it.