Grading and site prep scheduling, stake to fine grade.

Book the dozer, the grader and the roller to the job, put the right operator on every pass, and get the compaction tester out on the right day.

A yellow CAT compact track loader with a laser grader box and two receiver masts finishing a new-home side yard, a laser level on a yellow tripod by the house and an orange paint line across the dirt Laser Receiver masts Grader box
JobNew-home side yard
MachineCAT 259D3, laser grader box
PhaseFine Grade
Where, whenUtah, September 2022

Profile A–A

Scrub the grade, stake to silt fence.

One commercial lot and the nine phases a grading job goes through. Move the slider: the ground changes, and the crew, the machines and the Parli task for that phase light up.

Phase 01 / 09Pre-Construction

Profile A–A · Riverton Medical OfficeVertical exaggerated
9698100102104106 0+000+501+001+502+002+503+00 T-1T-2T-3 Silt fence Stockpile ✓ Grade checked C/F C0.6C2.2C1.4F0.4F2.1F1.2C0.3 9698100102104106 0+000+501+001+502+002+503+00 T-1T-2T-3 Silt fence Stockpile ✓ Grade checked C/F C0.6C2.2C1.4F0.4F2.1F1.2C0.3
Ground now Existing ground Design grade, −1.00% Laser plane Topsoil Fill, in lifts Taken off C/FCut or fill to design, ft

The profile and its numbers are drawn for this page. Parli doesn't figure cut and fill, read machine control or GPS, or count loads. The nine phases are the Grading & Site Prep set in Parli; the tasks are examples.

Details

The tester, the rain and the rest of the week.

The compaction tester

Book the tester as a sub visit for the day the fill will be ready. Parli emails them, and they confirm or propose a different time. No app, no login.

They tap Yes, we'll be there, or send a new time for the office to accept or decline. Reminders go out 2 days before by default, or 1, 3, 7 or 14.

See Subcontractors

A rain day

Rain in the job's forecast? Drag Rough Grade a day later on the Gantt chart, and the passes linked after it slide with it. The Calendar shows everyone the new days.

Machines on those tasks are rebooked for the new days. The tester's visit sits on the same chart, so you can see it needs a new day too.

See Gantt Chart

On record

The foreman files a Weather delay field report from the phone, so the lost day is written down with the job.

The weather is picked by hand. No signal on the lot? The draft stays on the phone until it's sent.

See Field Report
Side view of a yellow CAT 259D3 compact track loader with a black CAT laser grader box and two tall receiver masts, parked on fresh gravel Receiver masts Grader box Track loader
Elevation view · The 259D3 and its grader box, April 2023.

The yard

The grader, the dozer and the roller, booked once.

  • One job at a time. A machine, attachment or trailer can't be on two jobs the same days. Parli shows what has it and where.
  • It moves with the task. Put the roller on Compaction & Proof Roll and it's booked for that task's days. Drag the task on the Gantt chart and the booking goes with it.
  • Down for service. A machine marked Maintenance can't be booked from the yard, and the task picker flags it in orange.
  • Tools by count. Lasers and compaction tools show how many are free, like 1 of 2 available.
  • Attachments fit. Note which machines the grader box fits, right on the attachment.
See Equipment Scheduling

The operators

Tomorrow's passes, on every operator's phone.

Line up tomorrow on Dispatch and press Send. Each person gets only what changed for them. Their clock-ins carry the job and the machine, so the office can see who's on the grader and since when.

Field bookDakota S. · Thu, Oct 22

  1. The round-up: Fine grade, Riverton Medical Office.
  2. Clocked in on the job, on the CAT 140 grader. No signal on the lot, so the punch waited on the phone and sent later.
  3. Photo of the finished grade, filed to the job.
  4. Tomorrow, sent from Dispatch: Ridgeview Commercial, the 259D3.
A crew member holds a grade rod at the end of a long footing trench beside a new building, a mini excavator and a track loader working behind him and a survey instrument on a tripod
Checking grade on a footing trench. October 2022.

On the phone

On the lot.

The Gantt chart, the tester's answer, tomorrow's schedule and the yard. Tap one to see it full size.

On the computer

From the office.

The job day by day, who's coming, the month and the tools.

Photo log.

  1. Photo 01Strip Topsoil

    A compact track loader and a small dozer on freshly cleared red dirt in evening light
    Cleared and ready to stripApril 2022
  2. Photo 02Rough Grade

    A big CAT dozer and an excavator working a hilltop lot above a lake under a wide cloudy sky
    Hilltop lot above the lakeNovember 2023
  3. Photo 03Compaction & Proof Roll

    From a track loader cab: a mini excavator and a smooth-drum roller with its operator prepping a big dirt lot, mountains behind
    The roller on a lot prepMay 2023
  4. Photo 04Fine Grade

    A finished graded gravel lot with paint marks, utility stubs and a concrete slab, mountains behind
    Graded, marked and stubbedUtah

Questions

Common questions

Does Parli have a grading template?

Yes, on Corporation+. Pick Grading & Site Prep when you make a job and its board starts with nine phases: Pre-Construction, Survey & Staking, Strip Topsoil, Rough Grade, Cut & Fill, Compaction & Proof Roll, Fine Grade, Erosion Control, and Certification & Closeout. Rename, recolor or delete any of them. A job you already have can add them from its board.

Can I schedule the compaction tester?

Yes. Add the testing company as a subcontractor and book the visit for the day you'll be ready. Parli emails them to confirm or propose a different time, and sends a reminder two days before by default. They don't need the app or a login, and the visit shows on the job's Gantt chart. Or make the test a task on the job, if you'd rather.

What happens to the schedule on a rain day?

Parli shows the job's forecast. When you lose the day, drag the task a day later on the job's Gantt chart, and every task linked after it moves too, with the machines on them. If one of those machines is on another job on the new days, Parli won't make the move. The Calendar shows everyone the new days, and a Weather delay field report puts the day on record. The Gantt chart comes with every paid plan.

Does Parli do earthwork takeoffs or cut and fill volumes?

No. Parli schedules the people, machines and subs on a grading job. It doesn't figure volumes, read machine control or GPS, or count loads.

Can my operators see tomorrow's work?

Yes. Put them on the job in Dispatch and press Send. Each person gets only what changed for them, on their phone, and the 6 AM round-up lists what's due that day.

Can Parli keep the grader and the roller from being double-booked?

Yes. A machine can't be booked to two jobs on the same days. The Free plan has one active job and one machine, one attachment, one tool and one trailer. Paid plans have no limit on machines.

Schedule your next grading job on Parli.

Free to start. The Gantt chart comes with every paid plan.